Solar Panel Subsidy in Haryana, 2023

To save and resources for the future generation, of Haryana (Department of Renewal Energy) has started an electricity saving project called as Solar Rooftop Power Plant. Under this scheme, provides Solar System Plant to every Residential, Institutional, Social Sector, Private, and Commercial & Industrial Sector across state.

We all know the advantages of solar and its importance in our still, not everyone is adopting it in the residential/commercial sector and its obvious reason is expensive.

Therefore, Haryana government understood this problem and launched solar subsidy 30% of the benchmark cost for this sector. Besides, 70% subsidy in hill stations states like Himachal Pradesh, Uttarakhand, and Jammu & Kashmir, and 90% subsidy available for farmers on water pumping systems.

The objective of this solar scheme is to promote alternate green which is cost-effective almost 90% off over normal electricity served by DHBVN (Dakshin Haryana Bijli Vitran Nigam). If you are getting bills between Rs. 2000-3000 then your average cost is Rs. 7/ from using solar you get it as Rs. 2/unit.

Benchmark cost of Grid Connected Solar System as per the Central Government of India, MNRE - Last Updated, January, 2022

System Govt. Subsidy Customer Price
Up to 3kW 40%
Above 3kW to Upto 10kW  20%
Above 10kW 0%
Cost of 3kW Solar System Without Subsidy 1,80,000
Customer Payable Amount With Subsidy (- Rs. 72,000) 1,08,000
Cost of 5kW Solar System  Without Subsidy 3,00,000
3kW 40% Subsidy (3*24,000) -72,000
2kW 20% Subsidy (2*12,000) -24,000
Customer Payable Amount With Subsidy (-96,000) 2,04,000
5kW - Generation Benefits Units - Rs. 7.5/U
Daily Genration 25 Units 187
Monhtly Genration 625 Units 4687
Yearly Generation 7,500 Units 56, 250
Lifetime Generation 1,87,500 Units 14,06,250
Return on Investment 3.6 years
Income 6.89X
Installation Area
1. Mono Perc 500 sq.ft.
2. Shark 440W - 540W 300 sq.ft.

    Step-1: Visit Renewable Energy DepartmentHaryana/ Haryana Renewable Energy Development Agency (HAREDA)

    Where can I register to get solar subsidy

     Visit: www.hareda.gov.in

    Step-2: Sign up link (Create username and password)

    Step-3: Click on Apply 

    step by step guide to get subsidy in haryana

    What are the documents required to apply for solar system?

    Soft copy of Identity Proof (Any One):

    • PAN Card
    • Passport
    • Voter Card
    • Aadhaar Card
    • Driving License
    • Identity Card issued by govt. department
    • Soft copy of Residence Proof - Electricity Bill

    Step-4:  Fill up all required details and submit

    Step-5: Courier all documents to HARDEA office in Panchkula or your nearest office.

    Why should We Install Grid Connect/On Grid solar system?

    • Reduce your electricity bill up to 90%.
    • Life more than 25 years.
    • Payback period about 5 years.
    • No maintenance.
    • Additional FAR up to 12% allowed.
    • Approximately cost Rs. 60,000- Rs.75, 000 per kWp.
    • Additional incentive of up to Re.1.00 per unit on total solar power-generated in electricity bills.
    • Feed Excess Solar power to grid through Net-Metering Facility.
    • Generate approximately 1500 Units of electricity per kWp annually

    Important to know about solar plant installations

    • Space Requirement 10 Sq.mt./kwp
    • No Application fee
    • Installation of solar plant is mandatory in few categories in building
    • No permission required from HUDA for installation
    • Subsidy is available on grid connected system
    • Solar panel should be made in India.

    Loom Solar, is one of the Delhi NCR based solar company that gives you full details about the solar power system. We provide solar consulting & price list to the people who want to install solar system for home and business.

    What is the entire process?

    To apply solar subsidy, you should follow the following steps:

    Step 1: Site Survey. Book Engineer Visit from here.

    Step 2: System Capacity, Costing & Performance Analysis

    Step 3: Buy Solar System & Installation

    Step 4: Apply for Net Metering

    Step 5: Get Solar Subsidy after 30 days of rooftop solar panel installation 