Solar Panel Subsidy in West Bengal, 2023

West Bengal is a pioneer in solar technology in India. Government-owned WEBEL was one of the first manufacturers of solar energy panels in the country. It is mandatory for all large housing societies in West Bengal, (having a total contract demand of more than 500 kW) to install solar rooftop systems to meet a minimum of 1.5% of their total electrical load by solar energy. The subsidies are applicable as per SECI guidelines.

How & how much subsidy on solar can be availed? 

Subsidy/Support is available from Central Government through MNRE.

The subsidy available on the installation of grid-connected solar rooftop power plants is 30% of the benchmark cost. Government institutions including PSUs shall not be eligible for the subsidy. Instead, they will be given achievement-linked incentives/awards. All residential and institutional buildings such as schools, health institutions, etc. and the social sector can avail CFA.

Benchmark cost of Grid Connected Solar System as per the Central Government of India, MNRE - Last Updated, January, 2022

System Govt. Subsidy Customer Price
Up to 3kW 40%
Above 3kW to Upto 10kW  20%
Above 10kW 0%
Cost of 3kW Solar System Without Subsidy 1,80,000
Customer Payable Amount With Subsidy (- Rs. 72,000) 1,08,000
Cost of 5kW Solar System  Without Subsidy 3,00,000
3kW 40% Subsidy (3*24,000) -72,000
2kW 20% Subsidy (2*12,000) -24,000
Customer Payable Amount With Subsidy (-96,000) 2,04,000
5kW - Generation Benefits Units - Rs. 7.5/U
Daily Genration 25 Units 187
Monhtly Genration 625 Units 4687
Yearly Generation 7,500 Units 56, 250
Lifetime Generation 1,87,500 Units 14,06,250
Return on Investment 3.6 years
Income 6.89X
Installation Area
1. Mono Perc 500 sq.ft.
2. Shark 440W - 540W 300 sq.ft.


List of DISCOMS in West Bengal:

  1. Calcutta Electricity Supply Co.(CESC)
  2. Damodar Valley Corporation (DVC)
  3. Dishergarh Power Co. Ltd.
  4. Durgapur Project Limited
  5. WBSEDCL

What is the entire process?

To apply solar subsidy, you should follow the following steps:

Step 1: Site Survey. Book Engineer Visit from here.

Step 2: System Capacity, Costing & Performance Analysis

Step 3: Buy Solar System & Installation

Step 4: Apply for Net Metering

Step 5: Get Solar Subsidy after 30 days of rooftop solar panel installation

  1. Calcutta Electricity Supply Co.(CESC)
  2. Damodar Valley Corporation (DVC)
  3. Dishergarh Power Co. Ltd.
  4. Durgapur Project Limited
  5. WBSEDCL